Client: Local Government / Infrastructure
Location: Ballard Street, Emerald QLD
Project Summary
Summacon Group was engaged to upgrade the stormwater drainage system along Ballard Street in Emerald. The works focused on replacing deteriorated infrastructure with new high-capacity stormwater components designed to manage heavy rainfall events and reduce the risk of localised flooding. The project required careful excavation and installation within a residential area, with strict adherence to environmental controls and community access.
Scope Of Works
Outcome
The upgraded stormwater system now provides improved performance, durability, and flood protection for the surrounding neighbourhood. Summacon delivered the project efficiently with minimal disruption, demonstrating our experience in managing urban infrastructure upgrades in regional communities.